Restrooms and Activity Centers

Home » Products » Restrooms and Activity Centers

Cedar Forest Products offers a variety of restroom & activity center options to fit any project’s needs. Many standard plans are available to choose from or a custom plan can be designed if needed. CFP also has numerous options when it comes to both the interior and exterior finishes of the building as well as all fixtures. Every CFP restroom and activity center is designed to be ADA compliant, attractive, functional and provide many years of service. 

Products


Standard features

Pre-engineered designs

  • Each shelter is pre-engineered to meet or exceed local building requirements
  • Stamped and sealed drawings with calculations completed by a structural engineer to meet state and local building codes
  • Restroom facilities meet ADA compliance requirements 

Cedar Timbers

  • Milled from Northern White Cedar for natural beauty, durability and structural integrity
  • Nominal solid 4” x 8” double tongue and groove timbers
  • Disassembled and delivered to the construction site
  • Cedar is highly desirable for its resistance to moisture, warpage, insects and fungus that can shorten the service life of other wood buildings 
  • Cedar’s cellular structure also offers a natural thermal efficiency

Exterior Wall Construction

  • Predrilled starter holes for 10” coated screws speed construction of solid timbers
  • Timbers are precut to length assuring staggered end joints and end matched for alignment, preassembled and construction coded to ensure a easy field fit
  • Disassembled and delivered to the construction site for reassembly
  • Salem square corners augment construction strength, reliability and weather seal with a 6” timber screw
  • Treated bottom plate with a sill seal and energy seal for all courses
  • Trim package included for base, corners, and roofline

Roofing/Roofline

  • #1 grade, kiln dried 2” x 6” SYP roof decking
  • 2” x 8” cedar fascia
  • 30-year architectural asphalt shingle package
  • Low pitch laminated SYP beams with Port Orford Cedar columns and 24” overhang

Doors & Windows

  • Items are shipped to the job site ready for installation
  • Primed steel doors with 3-part frame
  • Standard hardware includes handles, locks, hinges, closer, and sweep

Packages and Options

Cedar Forest Products offers plumbing and electrical fixture packages for all Restrooms and Activity Centers. These packages provide the fixtures needed to complete the project. They do not include the piping, wiring, conduit or MEP design plans. The packages need to be installed by a local plumbing or electrical contractor. HVAC can be added to buildings using a local HVAC contractor.

Optional Features

Follow us:

PO Box 145, West Olive, MI 49460

800.552.9495

info@cedarforestproducts.com